Industrial Fitter (m/f/d) job in Rodgau

Industrial Fitter (m/f/d) wanted in Rodgau – machine assembly & industrial projects

At a glance

Position
Industrial Fitter (m/f/d)
Location
Rodgau near Frankfurt am Main
Area of work
Rhine-Main region – from Frankfurt, Offenbach and Hanau to Darmstadt and Aschaffenburg – plus assignments across Germany with overnight stays
You're from
Rodgau, Rödermark, Dietzenbach, Seligenstadt, Obertshausen, Heusenstamm, Hainburg, Mainhausen, Babenhausen, Dieburg, Langen, Offenbach or Hanau – you start from Rodgau and head to sites in the Rhine-Main region
Employment
Full-time · mini-job · cooperation as a subcontractor
Start
immediately
Equipment
We provide the service vehicle, professional tools and workwear
Accommodation
Mid-range hotel with breakfast; on long projects a flat near the site – weekends at home
Pay
€19.30 – 24.50/hour – plus supplements and tax-free daily allowances on assignments
Training
In-house courses, external training and customer training on specialist topics – at our expense
Application
in 90 seconds, no cover letter – also via WhatsApp
Apply now in 90 seconds →

Industrial Fitter job in Rodgau – out of the daily grind, into real projects!

Are you an industrial fitter (m/f/d), metalworker or mechanic, or from the steel trade, and tired of monotonous work?
Then join us in the Mounting Crew!

At Omega Mounting you work on real industrial projects: machine assembly, plant relocations, production lines and special solutions – nothing run-of-the-mill, just demanding technology.

We're looking for reinforcement for our Rodgau base for jobs throughout the Rhine-Main region and beyond.

Your tasks as an Industrial Fitter at Omega Mounting

What a day with us looks like

Real jobs from our project diary – with photos and figures, just as it really goes on site:

Who we're looking for

What we offer you

Why Omega Mounting?

Your new job as an Industrial Fitter in Rodgau is waiting for you!

Become part of a team that moves industry.
Apply now directly via our 90-second application form – no CV needed!

Insights into your working day

Monteur trennt mit dem Winkelschleifer ein Stahlprofil bei der Industriemontage
Zwei Monteure von Omega Mounting montieren einen Hallenkran in einer Werkshalle
Tobias Schott, Geschäftsführer von Omega Mounting

Your contact

Tobias Schott – boss and fitter

Questions about the job, the area of work or getting started? Just call me or message me on WhatsApp. You talk to me directly – not to an HR department.

Frequently asked questions about the Industrial Fitter job

What training do I need as an industrial fitter?

Completed training as an industrial mechanic, metalworker, steel fabricator or something comparable. Experience in industrial assembly or mechanical engineering is an advantage but not a requirement – technical understanding and practical skills count more with us than the title on your certificate.

Where are the work locations?

Our base is Rodgau. From there you work throughout the Rhine-Main region – and on larger projects across Germany. Assignments with overnight stays are part of the job.

Is the position also available as a mini-job or for subcontractors?

We fill the position full-time with long-term prospects. Alternatively a mini-job or cooperation as a subcontractor is possible – just tell us in your application what suits you.

Do I need a driving licence and my own tools?

You should have a category B driving licence; further categories are an advantage. A fully equipped service vehicle is available for many positions; we provide workwear and professional tools.

Where do I stay on assignments?

On short assignments of around one to four weeks you stay in a good mid-range hotel including breakfast – that's standard with us, not the exception. You spend weekends at home. If a site runs for months, we arrange living accommodation: either our own here in the region or – on major projects such as data centres – a flat or house near the site, often shared with other trades. That saves you long journeys and gives you a bit of home even on assignment.

Also open with us