Internship (m/f/d) in industrial assembly – Rodgau
Internship at Omega Mounting in Rodgau – site and workshop instead of the coffee kitchen
At a glance
- Position
- Internship (m/f/d) in industrial assembly
- Minimum age
- 18 – without that there's no access to our sites
- Location
- Rodgau near Frankfurt am Main
- Area of work
- Workshop in Rodgau and sites in the Rhine-Main region
- You're from
- Rodgau, Rödermark, Dietzenbach, Seligenstadt, Obertshausen, Heusenstamm, Hainburg, Mainhausen, Babenhausen, Dieburg, Langen, Offenbach or Hanau – you start from Rodgau and head to sites in the Rhine-Main region
- Type
- Compulsory internship during studies, compulsory school internship or voluntary internship
- Duration
- by arrangement
- Pay
- agreed with you personally
- Working hours
- Monday to Friday
- Equipment
- We provide workwear, protective equipment and tools
- Training
- In-house courses, external training and customer training on specialist topics – at our expense
- Application
- in 90 seconds, no cover letter – also via WhatsApp
Internship in industrial assembly – from age 18
Want to know how industrial assembly really works – not from a textbook, but on site? With us you ride out with the team, pitch in and see how a plant is built, moved or brought back to life.
Important first: you must be at least 18 years old. Most of our sites – data centres, the airport, industrial plants with access control – simply won't let you in before that. That's not a formality on our part; it's our clients' rule.
What you do with us
- Out on site with the assembly team – data centres, industrial halls, airport
- Lending a hand when machines and plants are set up, moved and dismantled
- In our Rodgau workshop: prefabrication, metalwork, preparing material
- Getting to know tools, lifting equipment and slinging gear and using them correctly
- Joining site surveys and documentation and understanding why both matter
- Watching, thinking along, asking questions – and step by step getting hands-on yourself
What a day with us looks like
Real jobs from our project diary – with photos and figures, just as it really goes on site:
Who we're looking for
- At least 18 years old – without that you can't get onto our sites
- Compulsory internship during studies, compulsory school internship (FOS) or voluntary internship for orientation
- Interest in technology, machines and craftsmanship – no prior knowledge needed
- Reliability and punctuality: if the team leaves at six, it leaves at six
- Willingness to get up early sometimes and do physical work
- Category B driving licence is handy but not a must
What you get from us
- Real insights instead of busywork – you're with the team, not beside it
- Colleagues who explain why something is done the way it is
- We provide workwear, protective equipment and tools
- Duration and pay are agreed with you personally
- Working hours Monday to Friday – weekends are yours
- A reference you can actually use at university or school
- We don't offer a classic three-and-a-half-year apprenticeship. But we're constantly training: with our own courses, with what the market offers, and through our clients' training. Especially on specialist topics, that gives you access to knowledge that's otherwise hard to come by.
Why Omega Mounting?
- Industrial assembly throughout the Rhine-Main region – no two days alike
- Data centres, the airport, production plants: places you'd otherwise never see from the inside
- Our own workshop in Rodgau with metalwork shop, welding equipment and milling machine
- Small team, short lines, direct contacts
- No corporation – real teamwork
Keen to see real industrial assembly from the inside?
Drop us a short note on when you're available and what interests you. Application in 90 seconds – no CV needed.
Insights into your working day



Your contact
Tobias Schott – boss and fitter
Questions about the job, the area of work or getting started? Just call me or message me on WhatsApp. You talk to me directly – not to an HR department.
Frequently asked questions about the internship
From what age can I do an internship at Omega Mounting?
With us from age 18 – we don't offer school internships for under-18s. The reason: otherwise you can't get onto our sites. Data centres, the airport and many industrial plants require adults for access – on top of that come the restrictions of the German youth employment protection act for hazardous work, heights and machinery. An internship where you'd only be allowed to stay in the workshop would deprive you of the essentials. So: from 18.
What kinds of internship are possible?
Compulsory internships during studies, compulsory school internships – for example from the Fachoberschule – and voluntary internships for orientation. In all cases you need to be at least 18 when the internship starts.
Do I need prior knowledge?
No. Technical interest and the willingness to work along are enough. Colleagues on site and in the workshop show you everything else.
How long does the internship last and is it paid?
We agree both with you personally – depending on what your university or school requires and how much time you have. Just get in touch.
Can I do an apprenticeship after the internship?
We don't offer a classic three-and-a-half-year apprenticeship ourselves. But as a team we're constantly training – internally with our own courses, externally with what the market offers, and through our clients' training. Especially on data centre sites you get access to specialist topics you won't find elsewhere.
And if you want a proper apprenticeship: we've been working in the Rhine-Main region for over ten years and know who's looking for apprentices right now. Several of our interns have found an apprenticeship at a partner company through us – a few of them now work with us again, this time as skilled workers. One who started with us as an intern on site is now a qualified electrical worker.
What should I bring?
Sturdy shoes and clothes that can get dirty. You get workwear, protective equipment and tools from us.